Remodel of the Guest Bathroom

This is the before picture of our guest bathroom. It was all pink (an ugly pink I might add) the vanity, mirror, toilet, bathtub and floor were this pink color.

Demolition! It is really amazing to see what is under all that gross stuff but it was truly rewarding to finally start the process of making it look beautiful.


After a lot of prep work we finally got the cement board on the floor, the tub installed, and the cement board on the walls in the shower.

Brandon laid the tile while I did the cutting. I truly have great brothers, thank you Brandon for your help I truly believe we would still be working on all of our projects without your help.

Brandon and I tiling the shower.

After one night of working on the shower this is what we accomplished (Note: this is on a weeknight after work so we only worked about 2 hours).

I am proud to say after working on two walls in the shower with Brandon, Aaron and I did the third all by ourselves.

The completion of the shower tile without grout.

Finally done with the bathroom.
Remodel of the Kitchen
This is the before pictures of what it used to look like. There is now a wall all the way across with the kitchen on the other side.

This is the old kitchen with the original 1957 cupboards and appliances. Where the fridge is we now have a pantry and computer nook.

We decided to tear out the wall between the kitchen and living room and put a 16 foot 6 inch beam. In order to do this we had to do put two temporary support walls because the wall we were taking out was a load bearing wall.

With the supporting walls up.

Middle view

Start of the demolition.

Brick by brick it came down.

The beam!!!!! Thank you family and friends for helping lift this huge thing into place.

The beam without the walls. We were a little leary taking the support walls down, but it held. Thank Goodness!

The demolition of the kitchen. This wall was connected to the ceiling hanging cabinets and nothing else so we had to take it down.

The view from front to back with out the wall.

Putting up the new wall.

We decide to put up new sheet rock on the outside wall and we discovered some pretty brick. Due to not having any isolation and not being able to hang the cabinets to brick we decided we not the leave the brick exposed.

Putting up the planks to hang the dry wall to the wall.

Dry wall completed. This is were our new kitchen is going to be.

The Cabinets arrive!!

One wall of upper cabinets done. You just have to love Aaron's facial expressions.

Wall cabinets installed.

Fridge space and cabinets.

We had to install the island cabinets in one night to meet the deadline for the counter fitters who were coming in the morning. It seems to have turned out all right.

This picture shows just how crazy were. Aaron and I did not want to be with out a kitchen for two months so slowly we tore down the old kitchen while building the new one. You'll notice that the wall holding the back end of the sink had been removed. But since we needed it still we had a 2x4 holding it up in the back. This was the day we moved the fridge into our addition so it would be out of the way.

Final demolition of the old kitchen.

The counter tops Installed and the chandelier hung! After looking for a 2 1/2 months, through Lowes, Home Depot and 3 other lighting places and hundreds of chandeliers online we had finally settled on a chandelier that was close, but when we went to pick it up Home Depot had finally gotten this one. With the help of Aaron's family & our own bank account we got it installed

We were finally moved over to our new kitchen.

The before pictures of where the computer nook and pantry will be.

Framing and dry walling of the pantry.

After its all mudded.

Beginning of installing the tile in the kitchen.

This is a better picture of tile pattern.

This is the pantry and computer nook all done except the trim around the door and base boards.

Completion of the tile.
Remodel of the Living Room

Before Picture

Before Picture different angle

Be gone paneling with no insulation.

We found some interesting things about our house. One was that we had a fire in our house by the fireplace. The previous owners fixed the beams and put fire proof insulation in the ceiling so we did the same. Although we have not used the fireplace until we can get it inspected.

Aaron and I get a kick out of what they have done with the house on some parts. They had a tile ceiling in the living room and I guess because of laziness they did not want to take it down and then put up sheet rock, so the just put the sheet rock on top with nails. Aaron pulled one sheet of sheet rock and the whole row came off also.

Goodbye you old door.

The room after sheet rocking and mudding. Thanks again Brandon for helping me sheet rock.

Our new fire proof insulated door.

After painting the living room.

We had to plug our fridge in the dining room while we tiled the kitchen.

Completed to a livable space. All we have to do now is trimming around the window and door and the base boards.

This is our completed dinning area.